Standard Building Contract
The Joint Contracts Tribunal (JCT) was formed by the Royal Institute of British Architects (RIBA) In 1931 when the first JCT standard form of building contract was issued (although the forms were not referred to as ‘JCT’ until 1977). JCT became a Limited Company in 1998. It now produces a range of standard forms of contract for the construction of buildings accompanied by guidance notes and other standard forms of documentation.
The JCT Standard Building Contract is intended for large or complex construction projects, procured via the traditional procurement route, where detailed contract provisions are needed.
The 2016 edition was released on 4 November 2016. New features include:
- Incorporation of the provisions of the JCT Public Sector Supplement 2011.
- Adjustments to reflect the Construction (Design & Management) Regulations 2015 and the Public Contracts Regulations 2015.
- Amendments to the works and existing structures insurance provisions.
- Revision and simplification of the Section 4 Payment provisions.
- Provisions for the grant of Performance Bonds and Parent Company guarantees.
- Revisions to the way the requirements for Collateral Warranties are set out.
- Incorporation of the provisions of the JCT 2012 Named Specialist Update.
The 2016 edition includes the following documents:
- Standard Building Contract With Quantities (SBC/Q).
- Standard Building Contract Without Quantities (SBC/XQ).
- Standard Building Contract With Approximate Quantities (SBC/AQ).
- Standard Building Contract Guide (SBC/G).
- Standard Building Sub-Contract Agreement (SBCSub/A).
- Standard Building Sub-Contract Conditions (SBCSub/C).
- Standard Building Sub-Contract with sub-contractor’s design Agreement (SBCSub/D/A).
- Standard Building Sub-Contract with sub-contractor’s design Conditions (SBCSub/D/C).
- Standard Building Sub-Contract Guide (SBCSub/G).
- Standard Building Contract With Quantities (SBC/Q) Tracked Change Document.
- Standard Building Contract Without Quantities (SBC/XQ) Tracked Change Document.
- Standard Building Contract With Approximate Quantities (SBC/AQ) Tracked Change Document.
[edit] Related articles on Designing Buildings Wiki
- Articles of agreement.
- Collateral warranty.
- Construction contract.
- CPC2013.
- FIDIC.
- Intermediate Building Contract.
- JCT.
- JCT Design and Build Contract.
- Key dates.
- Latham report.
- Management Building Contract.
- Minor works.
- Modifying clauses in standard forms of contract.
- NEC3.
- Procurement route.
- Standard form of contract.
- Sub-contract.
Featured articles
Check out some of the best features and news from Designing Buildings as well as key stories from around the web.
Fire performance of thermal insulation
Flat roof assemblies with PV.
Become a Professional Development Partner
CIOB launches a new framework for staff development and chartered membership.
Dorset's first conservation campaigner?
Gov.uk - Hot-rolled steel plate
New anti-dumping measure imposed on South Korea.
ECA responds to the Milburn Report
Youth employment to be linked to workforce demand.
The construction industry urgently needs to attract new talent
CIOB responds to Neets report.
Grenfell Tower community update
Memorial columns to be retained as careful dismantling continues.
When buildings reflected the local resources available.
CIOB reports 57% are using artificial intelligence technologies.
More of England’s ‘hidden heroes’ will be celebrated.
CIAT calls for retrofit to be a priority.
Version 6 is now available, along with guidance for ECA members.